Trial

June 7, 2013
Trail Area

Trial Area

Two passes with discs and drilled with triple disc drill

June 7, 2013
2255

Installing Tape

Trial area has 1 meter spacing and 250ml deep

June 7, 2013
Trench

Trench

Trench for water manifold and risers

June 7, 2013
Tape Plumped in

Tape plumbed in

Taps on yellow valve for future experiments

June 7, 2013
3 weeks

3 Weeks

Three weeks after drilling

June 7, 2013
16 Weeks

16 Weeks

16 weeks after drilling, March 12th, 5 days after grazing. Irrigation  history average 1.8ml per day from mid January to March 6th. Note roots around drip tape, and strong grass growth through 25 ml of dust on surface. No additional water applied other [...]